Selection & Charging
Review operating voltage, load requirements, charging conditions and the proposed battery specification.

01 / YUNQING SMART POWER
Coordinate battery selection, sample validation, equipment integration and technical questions with the factory team.
Actual factory assembly discussion. Support scope and communication arrangements are agreed for each project.
02 / YUNQING SMART POWER
Review operating voltage, load requirements, charging conditions and the proposed battery specification.
Clarify connections and available interface or protocol information for the selected model.
Discuss test conditions, expected checks and questions from evaluation in the customer’s equipment.
Review reported behaviour, available records and battery-side information before identifying further checks.
Discuss selection before purchase, evaluation of samples, equipment integration and technical questions after delivery.
03 / YUNQING SMART POWER
04 / YUNQING SMART POWER
Send the model, equipment, conditions, issue description and supporting records.
Confirm the reported behaviour, expected operation and any missing information.
Compare the information with the agreed battery configuration and application conditions.
Discuss suggested checks or proposed changes; confirm any change scope before implementation.
The customer performs the agreed validation in the intended equipment and reports the result.
Summarise the result and confirm whether further review or specification updates are required.
05 / YUNQING SMART POWER
Discuss requirements and reported issues through agreed communication channels.
Review the available specifications, interface information and validation records for the model.
Changes affecting capacity, structure, BMS or performance require a separate engineering review.
Agree the roles for equipment design, installation, site testing and local service. On-site work is confirmed separately.
06 / YUNQING SMART POWER
Include your company, country, battery model and equipment. Describe the requirement or observed issue, operating and test conditions, and available photos or records. For a new project, attach the equipment specifications and target configuration.