01
Battery Specification Forms
Align nominal and working voltage, capacity, dimensions, weight, continuous current and peak current.
View Model Specifications →
TECHNICAL RESOURCES / PROJECT INTEGRATION
Select a battery, align BMS requirements and prepare the information needed for equipment integration. Explore engineering review topics and a practical battery project requirement template.
Detailed instructions and communication protocols are selected for the specific battery model and equipment.
01 / ENGINEERING DOCUMENTATION
Start with the model datasheet. To match your equipment, identify the document required and your project conditions.
01
Align nominal and working voltage, capacity, dimensions, weight, continuous current and peak current.
View Model Specifications →02
Identify your controller or inverter and required CAN / RS485 interface. Pin assignments and message protocols need confirmation for the selected model.
Request Documentation →03
Provide the charger model, output voltage and current. Charging settings and temperature limits are reviewed against the battery specification.
Request Documentation →04
Identify the battery compartment, mounting, orientation, cables and connectors. Request the model-specific instructions before installation.
Request Documentation →05
Provide minimum and maximum temperatures, charging conditions and heating needs. Limits vary by model and configuration.
Request Documentation →06
Specify storage duration and conditions. Request the selected model’s charge level, inspection and temperature requirements.
Request Documentation →07
Provide the existing battery, charger, load and installation space. Compatibility must be reviewed before replacement.
Request Documentation →08
Prepare the application, electrical requirements, dimensions, interfaces, documents and quantity for engineering review.
View Requirement Template →This list covers engineering review topics. Availability and revision of individual documents are confirmed for the model and project.
ENGINEERING REVIEW
Battery selection includes the charger, controller or inverter, mounting space and operating conditions. Share equipment specifications before confirming the pack configuration.
Actual battery pack assembly at YUNQING. Project-specific interfaces and settings require engineering confirmation.
02 / REQUIREMENT TEMPLATE
Copy the template below, complete the information you have and send it to our team. For an undecided parameter, write “selection support required”.
| Application | Equipment type, load and duty cycle |
|---|---|
| Electrical Requirements | Voltage, capacity or energy; continuous and peak current, peak duration |
| Mechanical Integration | Available dimensions, weight limit, mounting and connectors |
| Operating Conditions | Minimum / maximum temperatures, environment and heating needs |
| Charging & BMS | Charger / inverter / controller, CAN / RS485 and communication requirements |
| Procurement & Documents | Destination country, quantity, planned schedule and certification requirements |
This is an email preparation template, not a submission form. Attach available drawings, equipment specifications and project requirements.
03 / DOCUMENT ACCESS
Provide your company, business email, country, model, equipment and required document. This helps prepare information for engineering and procurement review.
Catalogs and basic specifications for initial selection.
Catalogs → · Datasheets →Instructions, charging and BMS requirements, and full test reports are selected for the model and project.
Test Documentation →Detailed drawings, BMS message protocols and confidential engineering information are discussed within the project; confidentiality arrangements may be agreed where needed.
Document availability, applicability and current revision are confirmed before release.